Simulated a complex rail network to understand issues and identify bottlenecks in the system upon introduction of new terminal. The system included 90+ trains operated by Tier 1 railroads, with varying schedules, priorities and characteristics.
- Modeled different routes and traffic along those routes to measure congestion at key rail/road intersections.
- Calculated the impact of a new container terminal on the regional rail network. The detailed rail model was used to make fact-based decisions relating to the planned terminal’s effect on the region’s traffic.
- Provided recommendations on infrastructure changes needed to alleviate problems in parts of the network such as automated switches, additional tracks, and schedule adjustments.
- Model results guided ongoing litigation regarding the matter and served as key means for stakeholder and community communication.
Other Case Studies
- All
- 3D simulation
- AMR
- Anylogic
- automated mobile robots
- bottlenecks
- conveyor design and implementation
- conveyor physics engine
- Distribution Center
- Emulate3D
- Emulate3D 2024 User Group Meeting
- industrial automation
- Logistics
- material movement analysis and design
- Oil-and-Gas
- order fulfillment
- Rockwell Automation
- Simulation
- slugging options
- terminal simulation
- throughput validation