Sibanye Stillwater: Simulating Backfill Operations for Underground Mining
This case study, presented at Winter Simulation Conference 2021, focusses on the simulation model that was developed for Sibanye-Stillwater’s underground platinum mining operations in Nye, MT. Sibanye-Stillwater is a global mining company based in South Africa with Platinum Group Metals (PGM) and Gold mines in the Americas and Africa. One of their US mines in Montana, Stillwater Mining Company, owns and operates underground mines for PGM ore and a Concentrator plant. The process involves mining, transporting muck to surface, milling ore and backfilling the mined out cavities with tailings from milling. The circular dependency between mining and backfilling, along with variability for each task, makes it difficult to develop a realistic schedule, and efficiently deploy equipment and people. This presentation will review the simulation model used to help Sibanye understand how the bottleneck shifts every week, understand which resource is constraining underground mining from increasing production and understand where capital investments are needed in backfill operations.
Contact MOSIMTEC to learn more about mining simulation for your operation.
MOSIMTEC’s core focus is assisting clients make better decisions through application of decision support tools. Our team has extensive experience working with leading mining simulation software and solving complex issues for clients across various industries.
Other Case Studies
- All
- 3D simulation
- AMR
- Anylogic
- automated mobile robots
- bottlenecks
- conveyor design and implementation
- conveyor physics engine
- Distribution Center
- Emulate3D
- Emulate3D 2024 User Group Meeting
- industrial automation
- Logistics
- material movement analysis and design
- Oil-and-Gas
- order fulfillment
- Rockwell Automation
- Simulation
- slugging options
- terminal simulation
- throughput validation