MOSIMTEC Case Study – Sibanye-Stillwater Nye Backfill Simulation (Process Digital Twin)
Category:
MOSIMTEC supported Sibanye-Stillwater (SS) at their Nye Mine. SS produces platinum, palladium and gold. The Nye Mine in MT is ~4 miles long and 4500 feet from top to bottom. MOSIMTEC developed a…